Year
.
1972
13 400
--- a
13400
1973
59 600
59 600
21 815
1974
5000
--- b
4850
1975
40 400
40 400
42 900
1976
68 600 c
--- d
59 218
1977
36 600
36 600
39 362
1978
22 450
22450
25 150 e
a $43 400 000 was authorized for large observatories, which included OSO, OAO, and HEAO.
b The total physics and astronomy authorization was reduced by $1 000 000.
c Includes $12 000 000 for the transition quarter.
d $62 000 000 was authorized for large observatories, which included OSO, OAO, and HEAO; authorization figures do not include the transition quarter.
e Includes $19 811 000 for development and $5 339 000 for mission operations.