Year
.
1969
35 200
---
36 392
1970
28 600
28 600
33 283
1971
27 100
27 100
23 210
1972
11 000
--- a
13 400
1973
5 600
5 600
5 700
1974
3 100
--- b
2 326
1975
2 380
2 380
2 216
1976
3 470 c
--- d
2 300
1977
2 600
2 600
2 600
1978
1 980
1 980
1 956
a $43 400 000 was authorized for large observatories, which included OSO, OAO, and HEAO.
b The total physics and astronomy authorization was reduced by $1 000 000.
c Includes $1 100 000 for the transition quarter.
d $62 000 000 was authorized for large observatories, which included OSO, OAO, and HEAO; authorization figures do not include the transition quarter.