SP-4012 NASA HISTORICAL DATA BOOK: VOLUME IV
NASA RESOURCES 1969-1978
 

Table 2-24. Contractor-Held Land Value as a Percentage of Total NASA Land Value by Installation and Fiscal Year

(at end of fiscal year)

 

Installation

1969

1970

1971

1972

1973

1974

1975

1976

1977

1978

.

Jet Propulsion Laboratory

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

100.0

Langley Research Center

5.2

NA

5.2

5.2

5.2

5.2

5.2

3.7

3.7

3.7

Lewis Research Center

5.8

NA

2.6

2.1

0.0

0.0

0.0

0.0

0.0

0.0

Manned Spacecraft Center a

39.5

NA

39.5

39.5

39.5

39.5

39.5

39.5

39.2

39.2

Marshall Space Flight Center

35.8

NA

28.8

100.0

100.0

100.0

100.0

100.0

100.0

100.0

National Space Technology Laboratories b

-

-

-

-

-

100.0

0.0

0.0

0.0

0.0

NA = Not available.
 
a Renamed Johnson Space Center in 1973.
b Established as an independent NASA field installation in 1974.
 
Source: Tables 2-12 and 2-23.
 


-
Back -