Apollo 14 Timeline

 

 

Event

GET

(hhh:mm:ss)

GMT

Time

GMT

Date

Terminal countdown started.

-028:00:00

06:00:00

30 Jan 1971

Scheduled 9-hour 23-minute hold at T-9 hours.

-009:00:00

01:00:00

31 Jan 1971

Countdown resumed at T-9 hours.

-009:00:00

10:23:00

31 Jan 1971

Scheduled 1-hour hold at T-3 hours 30 minutes.

-003:30:00

15:53:00

31 Jan 1971

Countdown resumed at T-3 hours 30 minutes.

-003:30:00

16:53:00

31 Jan 1971

Unscheduled 40-minute 2-second weather hold at T-8 minutes.

-000:08:00

20:15:00

31 Jan 1971

Countdown resumed at T-8 minutes.

-000:08:00

20:55:02

31 Jan 1971

Guidance reference release.

-000:00:16.960

21:02:45

31 Jan 1971

S-IC engine start command.

-000:00:08.9

21:02:53

31 Jan 1971

S-IC engine ignition (#5).

-000:00:06.5

21:02:55

31 Jan 1971

All S-IC engines thrust OK.

-000:00:01.6

21:03:00

31 Jan 1971

Range zero.

000:00:00.00

21:03:02

31 Jan 1971

All holddown arms released (1st motion) (1.05 g).

000:00:00.2

21:03:02

31 Jan 1971

Liftoff (umbilical disconnected).

000:00:00.57

21:03:02

31 Jan 1971

Tower clearance yaw maneuver started.

000:00:01.958

21:03:04

31 Jan 1971

Yaw maneuver ended.

000:00:09.896

21:03:11

31 Jan 1971

Pitch and roll maneuver started.

000:00:12.814

21:03:14

31 Jan 1971

Roll maneuver ended.

000:00:28.000

21:03:30

31 Jan 1971

Mach 1 achieved.

000:01:08.0

21:04:10

31 Jan 1971

Maximum bending moment (116,000,000 lbf-in).

000:01:16

21:04:18

31 Jan 1971

Maximum dynamic pressure (655.80 lb/ft2).

000:01:21.0

21:04:23

31 Jan 1971

S-IC center engine cutoff command.

000:02:15.14

21:05:17

31 Jan 1971

Pitch maneuver ended.

000:02:44.088

21:05:46

31 Jan 1971

S-IC outboard engine cutoff.

000:02:44.10

21:05:46

31 Jan 1971

S-IC maximum total inertial acceleration (3.82 g).

000:02:44.18

21:05:46

31 Jan 1971

S-IC maximum Earth-fixed velocity.

000:02:44.59

21:05:46

31 Jan 1971

S-IC/S-II separation command.

000:02:44.8

21:05:46

31 Jan 1971

S-II engine start command.

000:02:45.5

21:05:47

31 Jan 1971

S-II ignition.

000:02:46.5

21:05:48

31 Jan 1971

S-II aft interstage jettisoned.

000:03:14.8

21:06:16

31 Jan 1971

Launch escape tower jettisoned.

000:03:20.7

21:06:22

31 Jan 1971

Iterative guidance mode initiated.

000:03:25.912

21:06:27

31 Jan 1971

S-IC apex.

000:04:31.8

21:07:33

31 Jan 1971

S-II center engine cutoff.

000:07:43.09

21:10:45

31 Jan 1971

S-II maximum total inertial acceleration (1.81 g).

000:07:43.17

21:10:45

31 Jan 1971

S-IC impact (theoretical).

000:09:06.2

21:12:08

31 Jan 1971

S-II outboard engine cutoff.

000:09:19.05

21:12:21

31 Jan 1971

S-II/S-IVB separation command.

000:09:20.00

21:12:22

31 Jan 1971

S-II maximum Earth-fixed velocity

000:09:20.07

21:12:22

31 Jan 1971

S-IVB 1st burn start command.

000:09:20.1

21:12:22

31 Jan 1971

S-IVB 1st burn ignition.

000:09:23.4

21:12:25

31 Jan 1971

S-IVB ullage case jettisoned.

000:09:31.8

21:12:33

31 Jan 1971

S-II apex.

000:10:00.2

21:13:02

31 Jan 1971

S-IVB 1st burn cutoff command.

000:11:40.56

21:14:42

31 Jan 1971

S-IVB 1st burn maximum total inertial acceleration (0.67 g).

000:11:40.66

21:14:42

31 Jan 1971

Earth orbit insertion. S-IVB 1st burn maximum Earth-fixed velocity.

000:11:50.56

21:14:52

31 Jan 1971

Maneuver to local horizontal attitude started.

000:12:02.092

21:15:04

31 Jan 1971

Orbital navigation started.

000:13:22.323

21:16:24

31 Jan 1971

S-II impact (theoretical).

000:20:46.3

21:23:48

31 Jan 1971

S-IVB 2nd burn restart preparation.

002:18:54.20

23:21:56

31 Jan 1971

S-IVB 2nd burn restart command.

002:28:24.10

23:31:26

31 Jan 1971

S-IVB 2nd burn ignition.

002:28:32.40

23:31:34

31 Jan 1971

S-IVB 2nd burn cutoff.

002:34:23.24

23:37:25

31 Jan 1971

S-IVB 2nd burn maximum total inertial acceleration (1.45 g).

002:34:23.34

23:37:25

31 Jan 1971

S-IVB 2nd burn maximum Earth-fixed velocity.

002:34:23.67

23:37:25

31 Jan 1971

S-IVB safing procedures started.

002:34:23.9

23:37:25

31 Jan 1971

Translunar injection.

002:34:33.24

23:37:35

31 Jan 1971

Orbital navigation started.

002:36:54.841

23:39:56

31 Jan 1971

Maneuver to local horizontal attitude started.

002:36:55.064

23:39:57

31 Jan 1971

Maneuver to transposition and docking attitude started.

002:51:04.339

23:54:06

31 Jan 1971

Maneuver to transposition and docking attitude ended.

002:55:23.37

23:58:25

31 Jan 1971

CSM separated from S-IVB.

003:02:29.4

00:05:31

01 Feb 1971

TV transmission started.

003:05

00:08

01 Feb 1971

1st docking attempt - 1st contact.

003:13:53.7

00:16:55

01 Feb 1971

1st docking attempt - 2nd contact.

003:14:01.5

00:17:03

01 Feb 1971

1st docking attempt - 3rd contact.

003:14:04.45

00:17:06

01 Feb 1971

1st docking attempt - 4th contact.

003:14:09.0

00:17:11

01 Feb 1971

2nd docking attempt.

003:14:43.7

00:17:45

01 Feb 1971

3rd docking attempt.

003:16:43.4

00:19:45

01 Feb 1971

4th docking attempt.

003:23:41.7

00:26:43

01 Feb 1971

5th docking attempt.

004:32:29.3

01:35:31

01 Feb 1971

6th docking attempt.

004:56:44.9

01:59:46

01 Feb 1971

CSM docked with LM/S-IVB (initial docking latch triggered).

004:56:56.7

01:59:58

01 Feb 1971

TV transmission ended.

005:00

02:03

01 Feb 1971

CSM/LM ejected from S-IVB (RCS ignition).

005:47:14.4

02:50:16

01 Feb 1971

CSM/LM ejected from S-IVB (RCS cutoff).

005:47:21.3

02:50:23

01 Feb 1971

Maneuver to attitude for S-IVB APS evasive burn initiated.

005:55:30

02:58:32

01 Feb 1971

S-IVB APS evasive maneuver ignition.

006:04:01.7

03:07:03

01 Feb 1971

S-IVB APS evasive maneuver cutoff.

006:05:21.9

03:08:23

01 Feb 1971

Maneuver to S-IVB LOX dump attitude initiated.

006:13:43.0

03:16:45

01 Feb 1971

S-IVB lunar impact maneuver - CVS vent for lunar targeting velocity change

   started.

 

006:20:40.5

 

03:23:42

 

01 Feb 1971

S-IVB lunar impact maneuver - LOX dump started.

006:25:20.5

03:28:22

01 Feb 1971

S-IVB lunar impact maneuver - CVS vent for lunar targeting velocity change

   started.

 

006:25:40.5

 

03:28:42

 

01 Feb 1971

S-IVB lunar impact maneuver - LOX dump ended.

006:26:08.5

03:29:10

01 Feb 1971

Maneuver to attitude required for final S-IVB APS burn initiated.

008:43:41.0

05:46:43

01 Feb 1971

S-IVB lunar impact maneuver - APS ignition.

008:59:59.0

06:03:01

01 Feb 1971

S-IVB lunar impact maneuver - APS cutoff.

009:04:11.2

06:07:13

01 Feb 1971

TV transmission started.

011:00

08:03

01 Feb 1971

Hatch, probe, and drogue removed for inspection.

011:30

08:33

01 Feb 1971

TV transmission ended.

012:12

09:15:02

01 Feb 1971

Midcourse correction ignition (SPS).

030:36:07.91

03:39:09

02 Feb 1971

Midcourse correction cutoff.

030:36:18.10

03:39:20

02 Feb 1971

Earth darkside dim-light photography.

031:00

04:03

02 Feb 1971

S-IVB photography.

034:00

07:03

02 Feb 1971

Lunar topographic camera unstowed and checked out.

034:15

07:18

02 Feb 1971

Bistatic radar frequency check.

052:00

01:03

03 Feb 1971

Mission clock updated (000:040:02.9 added).

054:53:36

03:56:38

03 Feb 1971

LM pressurization started.

059:50

08:53

03 Feb 1971

TV transmission started.

060:05

09:08

03 Feb 1971

Preparation for LM ingress.

060:10

09:13

03 Feb 1971

CDR and LMP entered LM.

060:30

09:33

03 Feb 1971

TV transmission ended.

060:42

09:45

03 Feb 1971

LM system checks.

061:40

10:43

03 Feb 1971

Water dump photography.

061:50

10:53

03 Feb 1971

CDR and LMP entered CM.

062:20

11:23

03 Feb 1971

Equigravisphere.

066:09:01

15:12:03

03 Feb 1971

LM cabin pressurized.

075:20

00:23

04 Feb 1971

Midcourse correction ignition (SPS).

076:58:11.98

02:01:14

04 Feb 1971

Midcourse correction cutoff.

076:58:12.63

02:01:14

04 Feb 1971

LM ascent battery test started.

078:20

03:23

04 Feb 1971

LM ascent battery test ended.

080:20

05:23

04 Feb 1971

Lunar orbit insertion ignition (SPS).

081:56:40.70

06:59:42

04 Feb 1971

Lunar orbit insertion cutoff.

082:02:51.54

07:05:53

04 Feb 1971

S-IVB impact on lunar surface.

082:37:53.4

07:40:55

04 Feb 1971

CSM landmark tracking.

085:10

10:13

04 Feb 1971

Descent orbit insertion ignition (SPS).

086:10:52.97

11:13:55

04 Feb 1971

Descent orbit insertion cutoff.

086:11:13.78

11:14:15

04 Feb 1971

CSM landmark tracking.

087:10

12:13

04 Feb 1971

Descartes photographed.

088:50

13:53

04 Feb 1971

LM pressurized.

101:05

02:08

05 Feb 1971

Docking tunnel opened. CDR and LMP entered LM.

101:20

02:23

05 Feb 1971

LM activation and system checks.

101:30

02:33

05 Feb 1971

CSM/LM undocking and separation ignition (SM RCS).

103:47:41.6

04:50:43

05 Feb 1971

CSM/LM undocking and separation cutoff.

103:47:44.3

04:50:46

05 Feb 1971

CSM landmark tracking.

104:20

05:23

05 Feb 1971

LM landing site observation.

104:30

05:33

05 Feb 1971

CSM orbit circularization ignition (SPS).

105:11:46.11

06:14:48

05 Feb 1971

CSM orbit circularization cutoff.

105:11:50.13

06:14:52

05 Feb 1971

Checkout of LM descent propulsion system and landing radar.

105:40

06:43

05 Feb 1971

CSM landmark tracking.

106:20

07:23

05 Feb 1971

CSM orbital science photography.

107:50

08:53

05 Feb 1971

LM landing radar on.

107:51:18.66

08:54:20

05 Feb 1971

LM false “data good” indications from landing radar.

107:52:46.66

08:55:48

05 Feb 1971

LM landing radar switched to low scale.

107:57:34.66

09:00:36

05 Feb 1971

LM loading abort bit work-around routine started.

107:58:13.80

09:01:15

05 Feb 1971

LM ullage on.

108:02:19.12

09:05:21

05 Feb 1971

LM powered descent engine ignition (DPS).

108:02:26.52

09:05:28

05 Feb 1971

LM manual throttle-up to full throttle position.

108:02:53.80

09:05:55

05 Feb 1971

LM manual target (landing site) update.

108:04:49.80

09:07:51

05 Feb 1971

LM throttle down.

108:08:47.68

09:11:49

05 Feb 1971

LM landing radar switched to high scale.

108:08:50.66

09:11:52

05 Feb 1971

LM landing radar velocity data good.

108:09:10.66

09:12:12

05 Feb 1971

LM landing radar range data good.

108:09:12.66

09:12:14

05 Feb 1971

LM altitude updates enabled.

108:09:35.80

09:12:37

05 Feb 1971

LM approach phase program selected.

108:11:09.80

09:14:11

05 Feb 1971

LM pitchover started.

108:11:10.42

09:14:12

05 Feb 1971

LM landing radar redesignation enabled.

108:11:51.56

09:14:53

05 Feb 1971

LM radar antenna to position 2.

108:11:52.66

09:14:54

05 Feb 1971

LM attitude hold mode selected.

108:13:07.86

09:16:09

05 Feb 1971

LM landing phase program selected.

108:13:09.80

09:16:11

05 Feb 1971

LM lunar landing (left pad touchdown).

108:15:09.30

09:18:11

05 Feb 1971

LM powered descent engine cutoff.

108:15:11.13

09:18:13

05 Feb 1971

LM right, forward, and aft pad touchdown.

108:15:11.40

09:18:13

05 Feb 1971

CSM landmark tracking.

109:30

10:33

05 Feb 1971

LM lunar surface navigation.

110:00

11:03

05 Feb 1971

CSM Gegenschein photography.

110:40

11:43

05 Feb 1971

CSM backward-looking zero phase observations.

111:20

12:23

05 Feb 1971

CSM forward-looking zero phase observations.

112:20

13:23

05 Feb 1971

CSM zodiacal light photography.

112:50

13:53

05 Feb 1971

1st EVA started (LM cabin depressurization started).

113:39:11

14:42:13

05 Feb 1971

Egress started CDR). Pre-egress operations started (LMP).

113:47

14:50

05 Feb 1971

1st EVA television transmission started.

113:50

14:53

05 Feb 1971

CDR on lunar surface. Environmental familiarization, modular equipment

   transporter unloading, and television deployment (CDR).

 

113:51

 

14:54

 

05 Feb 1971

LMP egress.

113:55

14:58

05 Feb 1971

Environmental familiarization, contingency sample collection (LMP).

113:57

15:00

05 Feb 1971

CSM tracking of landed LM.

114:10

15:13

05 Feb 1971

S-band antenna deployment started (CDR).

114:12

15:15

05 Feb 1971

Solar wind composition experiment deployed (LMP).

114:13

15:16

05 Feb 1971

Laser ranging retroreflector unloading started (LMP).

114:14

15:17

05 Feb 1971

Expendables transferred (CDR).

114:22

15:25

05 Feb 1971

LMP ingress.

114:23

15:26

05 Feb 1971

S-band antenna switching (LMP).

114:25

15:28

05 Feb 1971

LMP egress.

114:37

15:40

05 Feb 1971

Camera setup (LMP).

114:39

15:42

05 Feb 1971

United States flag deployed and photographed.

114:41

15:44

05 Feb 1971

LM and site inspection (CDR). Traverse to television started (LMP).

114:47

15:50

05 Feb 1971

TV panorama (LMP).

114:50

15:53

05 Feb 1971

Modular equipment transporter deployment (LMP). CSM landmark tracking.

115:00

16:03

05 Feb 1971

TV transfer to scientific equipment bay (CDR).

115:05

16:08

05 Feb 1971

Experiment package offloading started (CDR and LMP).

115:08

16:11

05 Feb 1971

TV positioning (CDR).

115:22

16:25

05 Feb 1971

Modular equipment transporter loading (CDR).

115:25

16:28

05 Feb 1971

Traverse to experiment package deployment site (CDR, LMP).

115:46

16:49

05 Feb 1971

Experiment package system interconnect, thumper and geophone unloading

  started (LMP).

 

116:03

 

17:06

 

05 Feb 1971

Experiment package system interconnect, passive seismic experiment offloading,

   laser ranging retroreflector deployment.

 

116:04

 

17:07

 

05 Feb 1971

Mortar offloaded (LMP).

116:26

17:29

05 Feb 1971

Charged particle lunar environment experiment deployment (CDR).

116:30

17:33

05 Feb 1971

Suprathermal ion detector experiment unloading and deployment (LMP).

116:34

17:37

05 Feb 1971

Deployment of experiment package antenna, passive seismic experiment, and

   laser ranging retroreflector and sample collection (CDR).

 

116:35

 

17:38

 

05 Feb 1971

CSM galactic survey photography.

116:40

17:43

05 Feb 1971

Penetrometer activity (LMP).

116:45

17:48

05 Feb 1971

Geophone deployment started (LMP).

116:47

17:50

05 Feb 1971

1st ALSEP data received on Earth.

116:47:58

17:51:00

05 Feb 1971

Thumper activity (LMP).

117:02

18:05

05 Feb 1971

CSM plane change ignition (SPS).

117:29:33.17

18:32:35

05 Feb 1971

CSM plane change cutoff.

117:29:51.67

18:32:53

05 Feb 1971

Mortar pack arming started (LMP).

117:37

18:40

05 Feb 1971

Return traverse started (CDR).

117:38

18:41

05 Feb 1971

Return traverse started (LMP).

117:42

18:45

05 Feb 1971

EVA closeout (LMP).

117:54

18:57

05 Feb 1971

Sample collection (CDR).

118:00

19:03

05 Feb 1971

EVA closeout (CDR).

118:03

19:06

05 Feb 1971

CSM Earthshine photography.

118:10

19:13

05 Feb 1971

LMP ingress.

118:15

19:18

05 Feb 1971

EVA ended (LMP).

118:18

19:21

05 Feb 1971

CDR ingress.

118:19

19:22

05 Feb 1971

1st EVA television transmission ended.

118:20

19:23

05 Feb 1971

1st EVA ended (cabin pressurization started).

118:27:01

19:30:03

05 Feb 1971

VHF bistatic radar test started.

119:10

20:13

05 Feb 1971

CSM orbital science photography.

129:30

06:33

06 Feb 1971

S-band bistatic radar test started.

129:45

06:48

06 Feb 1971

VHF and S-band bistatic radar tests terminated.

130:20

07:23

06 Feb 1971

2nd EVA started (cabin depressurization started).

131:08:13

08:11:15

06 Feb 1971

CDR egress.

131:13

08:16

06 Feb 1971

Familiarization and transfer of equipment transfer bag (CDR). LMP egress. CSM

   vertical and orbital science photography.

 

131:20

 

08:23

 

06 Feb 1971

Modular equipment transporter preparation (LMP).

131:21

08:24

06 Feb 1971

Modular equipment transporter loading (CDR).

131:28

08:31

06 Feb 1971

Lunar portable magnetometer offloading (CDR).

131:38

08:41

06 Feb 1971

Lunar portable magnetometer offloading (LMP).

131:39

08:42

06 Feb 1971

2nd EVA television transmission started.

131:40

08:43

06 Feb 1971

Evaluation of modular equipment transporter track (CDR).

131:43

08:46

06 Feb 1971

Lunar portable magnetometer operation (LMP).

131:44