SP-4305 ENGINEER IN CHARGE
Plan to correct VDT defects, 1928.

This diagram, based on an LMAL drawing from 1928, illustrates the lab's plan for correcting the turbulent airflow that had plagued the original VDT. Notice in particular the change from an open-throat to a closed-throat test section.


- Back -