
Lunar Rover Operations Handbook
Doc. LS006-002-2H
Prepared by the Boeing Company
LRV Systems Engineering
Huntsville, Alabama
April 19, 1971
Scanning and PDF formatting by Ron Wells.
Last revised 2 November 2005.
The document is available as a single PDF file:
- Lunar Rover Operations Handbook 38 Mb )
or in eight parts, each about about 5 Mb in size:
- Cover; Table of Contents; List of Illustrations; Section 1 - General Information: Vehicle Systems, Mobility Subsystem
( 4.8 Mb )
- Section 1 - General Information: Mobility Subsystem (cont.), Electrical Power Subsystem, Control and Display Console, Navigation Subsystem, Crew Station
( 5.4 Mb )
- Section 1 - General Information: Crew Station (cont.), Thermal Control, Space Support Equipment (inc. Deployment); Section 2 - Normal Procedures: Introduction
( 5.7 Mb )
- Section 2 - Normal Procedures: Introduction, Deployment, Configuration, Post-Deployment Checkout, Payload Loading
( 4.9 Mb )
- Section 2 - Normal Procedures: Payload Loading (cont.), Pre-Sortie Checkout and Prep, Configuration for Science Stop, Configuration for Science Stop Departure, Post-Sortie Checkout, Display Reading; Section 3 - Malfunction Procedures
( 4.6 Mb )
- Section 4 - Auxilliary Equipment; Section 5 - Operating Limitations; Section 6 - Operating Timelines
( 4.7 Mb )
- Section 6 - Operating Timelines (cont.); Section 7 - Operating Profiles; Section 8 - 1g Trainer Non-Crew Procedures
( 4.9 Mb )
- Section 8 - 1g Trainer Non-Crew Procedures (cont.)
( 2.8 Mb )