-
Computers in Spaceflight: The NASA
Experience
-
- Source Notes: Chapter
Seven
-
-
- 1. Interview with Dr. Helmut Hoelzer,
Huntsville, AL, June 24,1983.
-
- 2. Interview with Charles Swearingen,
Huntsville, AL, June 21,1983.
-
- 3. Interview with Jim Lewis, Marshall
Space Center, June 20, 1983; IBM Corporation, "Apollo Study
Report," October 1, 1963, p. 6.2.
-
- 4. Interview with Kyle Rone, IBM, Johnson
Space Center June 3, 1983.
-
- 5. See IBM, "Apollo Study Report," Volume
II, for a complete technical description.
-
- 6. IBM, "Apollo Study Report," p.
3.4.
-
- 7. IBM, "Apollo Study Report," Vol. II p.
3.5; F.B. Moore and J.B. White, Applications of Redundancy in, the
Saturn V Guidance and Control System, NASA-TM-X-73352, Huntsville,
AL, Marshall Space Flight Center, November, 1976, p. 10.
-
- 8. IBM, "Apollo Study Report," Vol. II,
pp. 3.2,3.3.
-
- 9. Swearingen interview; R. Alonso and
G.C. Randa, "Flight-Computer Hardware Trends," Astronaut.
Aeronaut., 33-34 (April 1967).
-
- 10. Lewis interview.
-
- 11. IBM Corporation, Saturn Launch
Computer Complex Software System Description, IBM Federal System
Division, Huntsville. AL, March 14, 1972, p. 12.
-
- 12. Interview with Jim Willbanks, IBM,
Kennedy Space Center, June 29, 1983.
-
- 13. J.W. Dahnke, "Computer-Directed
Checkout for NASA's Biggest Booster", Control Eng., 84 (August
1962); Lewis interview.
-
- 14. C.O. Brooks to multiple addressees,
October 5, 1962, Marshall Space Plight Center.
-
- 15. R. Dutton and W. Jafferis, Utilization
of Saturn/Apollo Control and Checkout System for Prelaunch
Checkout and Launch Operations, NASATM-X-65271, Kennedy Space
Center, Cocoa Beach, FL, July 22, 1968, p. 5.2.
-
- 16. Swearingen interview.
-
- 17. Willbanks interview.
-
- 18. Interview with Thomas S. Walton,
Kennedy Space Center, July 6, 1983.
-
- 19. Walton interview.
-
- 20. Walton interview.
-
- 21. Walton interview.
-
- 22. Walton interview.
-
- 23. W.E. Parsons et al., "PACE: Preflight
Acceptance Checkout Equipment," Astronaut. Aerospace Eng., 52
(July 1963).
-
- 24. Walton interview.
-
- 25. Dutton and Jafferis, p. 3.40.
-
- 26. A. Lasts and J.E. Miller, Apollo
Guidance and Control System Flight Experience, NASA-CR- 101823,
MIT, Cambridge, MA, June, 1969, pp. 1,3.
-
- 27. Interview with Bruce Miller, Kennedy
Space Center, July 5, 1983.
-
- 28. Interview with James E. Deming,
Kennedy Space Center, July 6, 1983.
-
- 29. Miller interview.
-
- 30. Miller interview.
-
- 31. W.O. Robeson to Mr. Siepert, Deputy
Director of NASA Kennedy Space Center, "Optimum Computer Support
to NASA," IBM Corp., Cape Canaveral, FL, July II, 1965, Kennedy
Archives.
-
- 32. Deming interview.
-
- 33. IBM Corporation, Saturn Software
Systems Development Study, December 8, 1972, p. 5.1.
-
- 34. IBM Corporation, Saturn Software
Systems, p.5.2.
-
- 35. Deming interview.
-
- 36. IBM Corporation, Saturn Software
Systems, December 8, 1972.
-
- 37. IBM Corporation, Saturn Software
Systems, p. 4.16.
-
- 38. IBM Corporation, Saturn Software
Systems, pp. 4.18,2.3.
-
- 39. James J. Hart "Analysis Apollo Launch
Operating Experience" in Space Shuttle Technology Conference, ASA,
Kennedy Space Center, TR-1113, May 3, 1971, p.15.
-
- 40. Hart, "Analysis of Apollo Launch
Operating Experience," p. 26.
-
- 41. Interview with Pam Biegert, Kennedy
Space Center, June 30, 1983.
-
- 42. Deming interview.
-
- 43. H.C. Paul, "A Standard Language for
Test and Ground Operations," Proceedings of the Space Shuttle
Integrated Electronics Conference, 2:355-358, Kennedy Space
Center, Cocoa Beach, FL, p.358.
-
- 44. H.C. Paul, "Launch Processing System
Transition from Development to Operation," Proceedings of the 14th
Space Congress, Cocoa Beach, FL, 27-29 April 1977, pp. 7.1-7.3,
Canaveral Council of Technical Societies, Cocoa Beach, p.
7.3.
-
- 45. Interview with Al Parrish, Kennedy
Space Center, June 28, 1983.
-
- 46. Space Shuttle Launch Operations Center
Study, NASA-TM-X-67292, Kennedy Space Center, Cocoa Beach, FL,
November 4, 1970, pp. 6.5, 6.11.
-
- 47. A.B. Sloan, "Vandenberg Planning for
the Space Transportation System," Astronaut. Aeronaut., 47
(November 1981).
-
- 48. Interview with R.C. Bulkley, IBM,
Kennedy Space Center, June 27 and 29, 1983.
-
- 49. W.E. Parsons, "Kennedy Launch
Processing System," Technology Today and Tomorrow: Canaveral
Council of Technical Societies, Proceedings of the Eighth Space
Congress, Cocoa Beach, FL, 19-23 April 1971, 1:11.31-11.40,
Canaveral Council of Technical Societies, Cocoa Beach, FL, 1971,
p. 11.34.
-
- 50. Space Shuttle Launch Operations Center
Study, pp. 2.1,4.2.
-
- 51. E.A. Dalke, "Unified Test Equipment: A
Concept for the Shuffle Ground Test System," NASA Manned Space
Center Proceedings of the Space Shuttle integrated Electronics
Conference, vol. 2, pp. 329-354, Johnson Space Center, Houston,
TX, p. 330.
-
- 52. Dalke, "Unified Test Equipment," p.
348.
-
- 53. General Electric Co., "Summary Report
for the Universal Control and Display Console," NASA CR-1 15350,
July 1971.
-
- 54. Interview with Henry Paul, Kennedy
Space Center, July 7, 1983.
-
- 55. Interview with Bill Bailey, Kennedy
Space Center, June 30, 1983.
-
- 56. C. Covault, "Cape Shuttle Capabilities
Broadened," Aviation Week and Space Technol., 40 (October
13,1975).
-
- 57. Bailey interview.
-
- 58. Interview with Frank Byrne, Kennedy
Space Center, June 29, 1983; Walton interview.
-
- 59. Henry C. Paul, letter to the author,
July 3, 1985.
-
- 60. Bailey interview.
-
- 61. Byrne interview, June 29, 1983.
-
- 62. G.W. Cunningham and D.M. Welsh,
"Launch Processing System: A Groundbased Component of Space
Shuttle," reprinted from Tech. Directions, 3 (1) (Spring 1977),
IBM Federal System Division, Bethesda, MD, p. 8.
-
- 63. H.C. Paul, "Launch Processing System
Transition from Development to Operation," p. 7.2.
-
- 64. Walton interview; Paul
interview.
-
- 65. KSC-DD~LPS~007, October 12,
1973.
-
- 66. Interview with Fred Heddens, IBM,
Kennedy Space Center, June 27 and 29, 1983.
-
- 67. H.C. Paul, "LPS-A System to Support
the Space Shuttle," Technology Today and Tomorrow: Proceedings of
the Twelfth Space Congress, Cocoa Beach, FL, 9-11 April 1975, pp.
8.3-8.7, Canaveral Council of Technical Societies, Cocoa Beach p.
8.3; Bailey interview.
-
- 68. Paul letter.
-
- 69. Cunningham and Welsh, "Launch
Processing System," p. 10.
-
- 70. Bulkley interview; Bailey
interview.
-
- 71. Walton interview.
-
- 72. Covault, "Shuttle Capabilities
Broadened," p. 40.
-
- 73. F. Byrne, G.V. Doolittle, and R.W.
Hockenberger, "Launch Processing System," IBM J. Res. Devel., 75
(January 1976).
-
- 74. Interview with Al Parrish, Kennedy
Space Center, June 28, 1983.
-
- 75. Cunningham and Welsh, "Launch
Processing System," p. 13.
-
- 76. Heddens interview.
-
- 77. Byrne interview, June 29, 1983.
-
- 78. Covault, "Shuttle Capabilities
Broadened," p. 41.
-
- 79. Byrne interview, June 29, 1983.
-
- 80. Byrne interview, June 29, 1983; Walton
interview.
-
- 81. W.W.Bailey, Launch Processing System:
Concept to Reality, Kennedy Space Center, Digital Electronics
Division, p. 5.
-
- 82. Parrish interview.
-
- 83. Walton interview.
-
- 84. Paul interview.
-
- 85. Byrne interview, June 29,1983.
-
- 86. Cunningham and Welsh, "Launch
Processing System," p. 10.
-
- 87. CCMS Hardware Project Requirements,
Pamphlet, no date, p. 189.
-
- 88. Byrne, et al., "Launch Processing
System," p. 81.
-
- 89. H.C. Paul, "Launch Processing System
Transition from Development to Operation," p. 7.1.
-
- 90. Paul interview; Byrne, et al., "Launch
Processing System," p. 82.
-
- 91. Byrne interview, June 29, 1983.
-
- 92. Paul interview.
-
- 93. Byrne interview, June 29, 1983
-
- 94. Byrne interview, June 29, 1983
-
- 95. Byrne interview, July 8, 1983.
-
- 96. CCMS Hardware Project Requirements, p.
197.
-
- 97. Byrne interview, July 8, 1983.
-
- 98. Parrish interview; Byrne interview,
June 29, 1983.
-
- 99. Biegert interview.
-
- 100. Parrish interview.
-
- 101. Byrne interview, June 29,
1983.
-
- 102. Biegert interview.
-
- 103. Parrish interview.
-
- 104. T.E. Utsman, "KSC Ground Support
Operation and Equipment for the Space Transportation System,"
Shuttle Propulsion Systems Proceedings of the Winter Annual
Meeting, Phoenix, AZ, 14-19 November 1982, pp. 73-77, American
Society of Mechanical Engineers, New York, 1982, p. 76.
-
- 105. Bailey interview.
-
- 106. Bailey interview.
-
- 107. D.A. Springer, "The Launch Processing
System for Space Shuttle," AIAA, ASME and SAE Joint Space Mission
Planning and Execution Meeting, Denver, CO, July 10-12, 1973, p.
4.
-
- 108. Biegert interview.
-
- 109. Bailey interview.
-
- 110. Biegert interview.
-
- 111. Interview with Jane Steams, Kennedy
Space Center, June 30, 1983.
-
- 112. Steams interview.
-
- 113. Interview with Bobby Bruckner,
Kennedy Space Center June 30, 1983.
-
- 114. Biegert interview; T.E. Utsman, "KSC
Ground Support Operation and Equipment for the Space
Transportation System," Shuttle Propulsion Systems Proceedings of
the Winter Annual Meeting. Phoenix, AZ, 14-19 November 1982, pp.
73-77, American Society of Mechanical Engineers, New York, 1982,
p. 76.
-
- 115. Bruckner interview.
-
- 116. H.C. Paul, "Launch Processing System
Transition from Development to Operation," p. 7.2.
-
- 117. Walton interview.
-
- 118. Interview with Brad Hughes, Kennedy
Space Center, July 5, 1983.
-
- 119. Bailey, Launch Processing System:
Concept to Reality, p. 7.
-
- 120. Paul interview.
-
- 121. Paul interview.
-
- 122. GOAL On-Board lnterface Language
Users Packages, KSC-LP-OP0334, April 27, 1983, Kennedy Library;
Paul, p. 7.2.
-
- 123. H.C. Paul, "LPS-A System to Support
the Space Shuttle," p. 8.4.
-
- 124. Springer, "The Launch Processing
System for Space Shuttle," p. 2.
-