NASA Investigation Board Report On The INITIAL FLIGHT ANOMALIES OF SKYLAB 1

TABLE LIST

Tables appear following the figures at the end of each Chapter

I-1

 Major Skylab Contractors

II-1

 Maximum wind speed in high dynamic pressure region for Apollo/Saturn 501 through Saturn 513 vehicles

II-2

 Extreme wind shear values in the high dynamic pressure region for Apollo/Saturn 501 through Saturn 513 vehicles

II-3

 Orbit parameters

II-4

 Normal major events

IV-1

 OWS meteoroid shield swing link settings and measurements

IX-1

 Orbital Workshop Program Meteoroid Shield Design Reviews

IX-2 

 Orbital Workshop Program Solar Array System Design Reviews


link to the previous pagelink to the index pagelink to the next page