Apollo 17
CSM Systems Checklist - Index
(Flown copy courtesy Ulli Lotzmann)
Systems Management
- 1-01 Propulsion system
- 1-02 Electrical power system
- 1-03 Electrical power system (continued)
- 1-04 Electrical power system (continued)
- 1-05 ECS - ECS monitoring check, ECS periodic redundant component check
- 1-06 ECS - CO2 absorber filter replacement
- 1-07 ECS - Debris screen check, CM O2 supply refill, Doff & don PGA, Partial suit checklist
- 1-08 Bioharness Procedures
- 1-09 Bioharness Placement Chart
- 1-10 Urine Dump Modes
- 1-11 Urine Dump Modes (continued)
- 1-12 Urine Dump Modes (continued)
- 1-13 ECS - Cabin pressurisation
- 1-14 ECS - Suit circuit/PGA integrity check
- 1-15 ECS - CM pressure dump
- 1-16 [Missing]
- 1-17 [Missing]
- 1-18 ECS - Waste water tank drain, Side hatch urine/Water dump, Cabin water removal
- 1-19 ECS - Water/gas separator servicing, Pre-LOI secondary glycol loop check, Contamination control
- 1-20 Caution and warning operational checks
- 1-21 Telecomm - Telecomm procedures - HGA operations
- 1-22 Telecomm - Chart, HGA scan and warning limit
- 1-23 Telecomm - Diagram - CSM antenna positions
- 1-24 Telecomm - TV camera operation (color)
- 1-25 Telecomm - VHF ranging operation, Rendezvous transponder activation & self test
- 1-26 Telecomm - Tape recorder operation
- 1-27 Telecomm - Communications modes
- 1-28 Telecomm - Communications modes (continued)
- 1-29 Presleep/postsleep checklist
- 1-30 Diagram - RCS engine, vent and radiator locations
- 1-31 System test indicator conversion chart
- 1-32 RCS propellant gauging meter correction nomograph
- 1-33 SPS propellant nomograph
Lunar Module Interface
- 2-01 LM interface - IVT to LM (checkout, TLC)
- 2-02 LM interface - IVT to LM (undocking, PDI)
- 2-03 LM interface - Final IVT to CSM. Sub-checklist - CM/LM Pressure Equalisation
- 2-04 Sub-checklist - CM/LM pressure equalisation (continued)
- 2-05 Sub-checklist - Tunnel hatch removal, Probe removal
- 2-06 Sub-checklist - Drogue removal, Crew transfer to LM (suited), Crew transfer to CSM (suited)
- 2-07 Sub-checklist - Remove LM umbilicals (Final), Install drogue & probe
- 2-08 Sub-checklist - Preload probe, Probe umbilical verification, Hatch installation
- 2-09 Sub-checklist - Hatch integrity check, Docking latch release
- 2-10 Sub-checklist - CSM/LM pressure equalisation (LOD), Docking hatch verification
- 2-11 Sub-checklist - LM umbilical connection, Malfunction list (Docking)
- 2-12 Sub-checklist - Malfunction list (Docking, continued)
- 2-13 Sub-checklist - Malfunction list (Docking, continued)
- 2-14 Sub-checklist - Malfunction list (Docking, continued)
- 2-15 Sub-checklist - Probe diagram
- 2-16 Sub-checklist - Probe diagram
Apex cover jettison
Emergency procedures
- emer1-01 Emergency CSM/LV separation - If powered flight
- emer1-02 Emergency CSM/LV separation - If coasting flight
- emer1-03 Suit compressor light, O2 flow high & rapid loss of surge tank pressure, Contamination in CM, Contamination in closed suit loop, Fire/smoke in CM
- emer1-04 G&N and SCS critical burns
- emer1-05 SPS, G&C coasting entry
- emer1-06 Emergency power down
- emer1-07 Power downs - ECS, Comms, CMC/IMU, SCS
- emer1-08 Launch bus loss
- emer1-09 Bus loss (continued)
- emer1-10 SPS burn bus loss
- emer1-11 SPS burn bus loss (continued)
- emer1-12 Entry bus loss
- emer1-13 Entry bus loss (continued)
- emer1-14 All FC's disconnected, AC bus overload + AC bus + Mn bus under V lites. FC1 (2, 3) lite
- emer1-15 SM RCS Thruster failed On, SM RCS light, SM RCS quad secure
- emer1-16 CM RCS fails to pressurise or feed propellant
- emer1-17 Verb 5, Noun 9 alarm codes
- emer1-18 Verb 5, Noun 9 alarm codes (continued)
- emer1-19 Verb 5, Noun 9 alarm codes (continued)
- emer1-20 Verb 5, Noun 9 alarm codes (continued)
- emer1-21 Verb 5, Noun 9 alarm codes (continued)
Copyright © 2017 by W. David Woods. All rights reserved.
Last updated 2017-02-20