[138] [Ref.2/6-90] SRB
ROTATION, PROCESSING AND SURGE FACILITY (RPSF).
- DESCRIPTION
- CONSISTS OF FOUR BUILDINGS LOCATED
NORTH OF VAB
- OFFLOAD, ROTATION AND PROCESSING
BUILDING CONSISTING OF AFT BOOSTER BUILDUP WORKSTANDS, 200
TON OVERHEAD BRIDGE CRANES, AND A RAIL TRACK WHICH TRAVERSES
THROUGH THE BUILDING.
- TWO STORAGE BUILDINGS FOR STORAGE OF
PROCESSED SRM COMPONENTS PRIOR TO STACKING.
- SUPPORT BUILDING
- OPERATIONS
- OFFLOAD, ROTATION AND PROCESSING
BUILDING
- RECEIVING, OFFLOAD, ROTATION AND
INSPECTION OF SRM SEGMENTS ARRIVING FROM MANUFACTURER IN
UTAH VIA RAILCAR.
- PLACEMENT OF PROCESSED SEGMENTS ON
TRANSPORTATION AND STORAGE PALLETS.
-
[Ref.2/6-91] [Aerial view of
facilities where SRBs are processed at KSC].