Report of the PRESIDENTIAL COMMISSION
on the Space Shuttle Challenger Accident
Volume 4 Index
Hearings of the Presidential
Commission on the Space Shuttle Challenger Accident: February 6, 1986
to February 25, 1986
FEBRUARY 6, 1986 SESSION [part 2 of
2]
[160] [Ref. 2/6-128]
LOGISTICS BUILDING (LC-39)
- 300,000 SQ. FT.
- WAREHOUSE, PROCESSING SUPPORT FOR SHUTTLE
SPARES.
HYPERGOLIC MAINTENANCE FACILITY (INDUSTRIAL
AREA)
- OFFLINE PROCESSING OF ORBITER FORWARD
REACTION CONTROL SYSTEM MODULE, AFT ORBITER MANEUVERING SYSTEM
MODULES.
- CHECKOUT (LPS), DESERVICING,
MAINTENANCE.
SRB PARACHUTE FACILITY (INDUSTRIAL
AREA)
- WASH, DRY, REFURBISH, ASSEMBLE AND STORE
RETRIEVED SRB PARACHUTES.
Back