[1210] [Ref. 3/7-78 1 of
2] Failure Scenario 6.
FAILURE SCENARIO 6
FAILURE MECHANISM
- PUTTY HOLDS PRESSURE OFF AND PRIMARY AND
SECONDARY O-RINGS ARE OFF SEAT (JOINT GAP OPENING COUPLED WITH
RESILIENCY) WHEN PRESSURE APPLIED
ASSESSMENT METHOD
- ANALYSES AND TESTS TO ESTABLISH AMOUNT OF
JOINT ROTATION FOR STS 51-L CONDITIONS
- TESTS TO EVALUATE PUTTY PRESSURE HOLDING
CAPABILITY WITH VARYING GAP DIMENSIONS. ENVIRONMENTAL EXPOSURES
PRIOR TO ASSEMBLY AND TEST TEMPERATURES
- TESTS TO EVALUATE JOINT SEALING
PERFORMANCE WITH SPACE BETWEEN O-RING AND SEALING SURFACE
FINDINGS TO DATE
- INITIAL TESTS INDICATE THAT PUTTY PRESSURE
HOLDING CAPABILITY MY BE SUFFICIENT TO SUPPORT THIS
SCENARIO
- ADDITIONAL TESTS, INCLUDING DYNAMIC
EFFECTS OF THE JOINT, ARE REQUIRED
[Ref. 3/7-78 2 of 2]
SRM hot gas leak failure scenarios.